Skip to main content

Residential complex with 11 balconies

Looking good for the long term...

Object: Residential complex in Dortmund-Mengede

Extent: 11 balconies, total area approx. 132 m²

Substrate: Tiles, screed as well as plastic, metal

Period: September 2005

Applied: WestWood® Wecryl waterproofing system

Detailabdichtung einer Geländerstütze Einsatzgebiet Balkon
Detailabdichtung eines Abflusses auf Balkon
Balkonanlage eines Wohngebäudes von außen.

Eleven balconies refurbished without seams or joints throughout

In the first construction phase, eleven balconies were refurbished on the third floor of the residential complex. Extensive preparatory work was necessary at the beginning. For example, the wall cladding as well as an old PU coating and partly old tile coverings were removed. The total area of approx. 132 m² was permanently and securely waterproofed with the fully fleece-reinforced WestWood® Wecryl waterproofing system. For visual relief, the connections to the rising building components were set off in dark gray.

References

WestWood on the exhibition grounds of the ICC

Highly crack-bridging parking garage renovation!

Wecryl surface protection system OS 14

Jetty for water cabs in Copenhagen

Safely on board!

Balcony renovation by the sea on Norderney

Balcony renovation with the WestWood Wecryl waterproofing system

Terrace and stair waterproofing

PMMA renovation of a terrace complex with architectural details

Dream garage in record time in London

From milking parlor to Shmuseum

Underground car park MARK in Munich

PMMA surface protection system WestWood Wecryl OS 10 - 2.0

Flat roof clinic in Bamberg

Operation successful - "clinic roof" saved

Floating pontoons "Norderelbstraße

In a short time reliable grip for the long term

Heliport Central Hospital

Open space heating for the UKSH in Lübeck

Balkonanlage eines Wohnkomplex von außen.

Residential complex Am Stutenanger

Energy balcony renovation

Underground car park in Eschborn

PMMA surface protection systems WestWood Wecryl OS 8 and OS 10

Beschichtung der Riegeloberseiten an der Hochstraße Elbmarsch

Transom top coating BAB 7, Elbmarsch elevated highway

Use for the only PMMA system with TAB approval

Industrial roof renovation

Roof waterproofing system for historic industrial roof

Landing Bridges

Refurbishment of the pontoons during ongoing operation

Topdeck University Hospital in Dresden

PMMA surface protection system WestWood Wecryl OS 10 - 2.0

Arbors WEG Rotdornweg

Tile look PMMA on six arcades

Access galleries Hohenrode

Successful coating even in winter months

Access to the AIRBUS factory site

Rehabilitation of the trough and tunnel structure in record time

Residential complex with 11 balconies

Looking good for the long term...

Balconies house sea air

Rapid redevelopment makes vacation rental further possible

Parking lot renovation in Cologne city center

Rapid refurbishment in just two weeks - with PMMA

Shed roof renovation

Strong in detail - secure adhesion - optimum elongation properties

Lookout tower on Fehmarn

WestWood PMMA Surface Protection System OS 10 - 2.0

Fachverarbeiter appliziert Haftvermittler für nachfolgenden Asphalt.

TUM Campus

Rehabilitation with waterproofing system under mastic asphalt

WEG Parksiedlung

Perfect solution for residual moisture and external thermal insulation composite system (ETICS)

Underground car park Friedrichsplatz in Kassel

Wecryl surface protection system OS 10 - 2.0

Balcony renovation in one day - Quickborn

CE-certified according to ETAG 005 - the Wecryl waterproofing system

Balcony with tile look

A balcony renovation directly on the Baltic Sea

Apartment house with balcony

Perfectly renovated balcony with frost-resistant tile look

Support head Predigtstuhlbahn

Safe protection made of PMMA for the world's oldest cable car

Parking garage Klingenthal Südringcenter

PMMA system structure with integrated open-space heating

WU concrete joint waterproofing

in the Belgian Quarter, Cologne

Hamburg Airport Parking Garage P6

Subsequent coating with crack-bridging protective system

Parking garage "Am Münster", Donauwörth

Refurbishment with the fastest OS 11 system on the market

Heated ramp

Open space heating in PMMA thin bed

Industrial hall DITTRICH + CO

Substance-preserving liquid waterproofing

Roof terrace Philharmonic Hall

Enjoying art dry and safe

all References