Parking garage "Am Münster", Donauwörth
Refurbishment with the fastest OS 11 system on the market
Object: Parking garage "Am Münster", Donauwörth
Scope: Total area approx. 850 m²
Substrate: Concrete
Period: August/September 2020
Applied: WestWood® Wecryl OS 11b in heavily stressed driving areas.
OS 11b for heavily frequented parking garage areas.
For the repair of this parking garage, two OS 11b systems were combined: a PU system for normally frequented areas and the WestWood® Wecryl OS 11b for heavily frequented areas. Although an OS 11b is only recommended to a limited extent by the wider professional community for high-traffic surfaces, the use of the WestWood® system is suitable precisely for these areas thanks to its excellent PMMA properties. The dynamic crack bridging properties, the high wear resistance as well as the cost effectiveness characterize this system. For maximum durability, an increased wear reserve of the wear layer was required. This was ensured by splitting the Wecryl 418 structural coating during application in two working steps. The result: a protection system perfectly matched to the requirements of the structure!